Work In Progress 【Second week】

This week we are going to built out our pavilion. The materials of the pavilion are Styrofoam, mounting board, cotton string, mural color paint, butter paper, light bulb.

First, we combine the two rectangular Styrofoam which is 60cm X 120cm into a square of 120cm X 120cm. After that we are doing the supporter of the pavilion. We cut out 4 slice of styrofoam and we stick chopstick on it so that it become heavier.

On that time, we have already left one week before the presentation, we have run out of time, but we still have not built out the structure of the pavilion. Besides of this assignment, we still have many assignment that have to be submitted on the end of July, July is our most busy month. On 29th July, we have our English Listening Test and on 30th July, we have our English Presentation in the morning and we have the Hero Costume Presentation for Creative Thinking Skill in the afternoon.
We decided to stay back on 30th July to finish our pavilion as the lantern had already finished. 

MacDonald for supper.


Half way on doing the pavilion.


Coloring the pavilion pillar with mural color.





Stick everything together with hot glue gun.
Nicoule :: Done already ? I am very tired.
Aderline :: Not yet, Wait arr~~ Suk Sian, the roof move right abit~
Aderline :: NO~~ left abit.
Suk Sian :: Where?

Haha~~ Fun time with team members.
After we are crazy on doing our work, we play chinese new year song in the late midnight.
The crazy mood ON ~~XD

That night we stay at the studio until 3am in the morning. After that, we went back to our room and I have to continue doing the lantern that we design until 5am.

Crazy night~~
To be continue~~~